Plant of Electric Vehicles in Kutaisi

Plant of Electric Vehicles in Kutaisi

In April 6, 2019 former Prime Minister of Georgia Mamuka Bakhtadze announced production of electric vehicles. Georgian Company “I Group” is the partner of Chinese Company “Changania” producing electric vehicles.

The first meeting between company “I Group” and “Alternative” was held in September. At the meeting our project team got familiarized with the ideas, plans and scales of functional and technological procedures of “I Group” and was collected information necessary for the preparation of conceptual design.

The same month “Alternative” prepared project of 6 conceptual design with its various design concepts by providing free choice to company “I Group” on selection of optimal version for the best realization of their ideas.

In September 17 parties concluded cooperation agreement. In order to have issued construction permit, “Alternative” submitted plant project with 23 000 square meters plot to Kutaisi City Hall within 20 days term from the date of signing agreement. In November 4 respective institution issued project permit without demur.

Infrastructure planning necessary for production of electric vehicles totally covers 95 000 square meters that was accomplished by “Alternative” within 20 working days. Besides, there were prepared detailed drawings of industrial floor, ramps, inner pits, sandwich panels, metal structures, their connections and nodes of the project of industrial facility considering utility system.